Why houses are bolted and braced
The two jobs do different things. Bolting is meant to keep the frame attached to the foundation, and sheathing the cripple walls is meant to help them resist folding sideways.
FEMA P-1100 is a guide for finding and fixing known weak points in wood-frame one- and two-family houses. According to the ATC store page its provisions should improve earthquake performance but are not intended to prevent damage, so we never promise an undamaged house.
Houses that need a look
The houses worth checking are the ones with a crawlspace under the first floor, especially older ones. The check is simple: go into the crawlspace, or have someone go, and see whether anchor bolts run through the sill and whether the short walls are sheathed.
If the sill plate is damp or soft, the bolting question is tied to a wood repair first. Our crawlspace post and beam repair page covers what damp wood means.
FEMA P-1100 and state building codes
Washington’s 2021 code editions took effect on March 15, 2024. Ask the city whether a retrofit is required for your house, and which code edition applies to the work.
Permits and engineers
Burien’s building code requires a permit to construct, alter or repair a building, with an exemption list that does not apply to critical areas, steep slopes or landslide hazard areas. Ask the permit center whether your project needs a permit.
The building official may require a registered design professional when documents must be prepared by one. Engineering in Washington is for registered engineers, which is separate from contractor registration. Ask the permit center whether a plywood-and-bolts retrofit needs stamped drawings.
What changes the cost
A retrofit costs what the house demands, so a look at the crawlspace comes before the written estimate and the listed ranges are only a starting point. What moves it:
- The length of foundation wall to be bolted and the number of cripple walls to be braced
- Crawlspace height and how hard it is to move through
- Wood that is damp or soft and must be dealt with first
- Whether a plan or a design professional’s drawings are needed
- Obstacles such as ducts, plumbing and old pier blocks
What Burien lots and rules add
Burien’s critical areas code covers erosion, landslide and seismic hazard areas, and says development in a seismic hazard area follows the earthquake design and seismic motion standards of the Burien construction code. Check the current text with the city and ask whether your lot is in a mapped seismic hazard area.
DNR’s Geologic Information Portal maps landslide hazards and earthquake ground response, liquefaction susceptibility included. Treat it as a regional guide and not a reading of one lot.
A sill that looks soft is a crawlspace post and beam repair question before it is a bolting one, and foundation drainage deals with the water behind it. Anything not mentioned here is on the Burien Foundation Repair home page.